Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature C over 12000C Two chambers C minimum Emissions C dioxin and heavy metaly C better then Kyoto protocol Emission C monitoring system Waste unloiding C directly from waste track to incinerator Burn Rate(Average kgs/hr) 25 kg primary chamber 800 degree secondary chamber 1000 degree chimney standard shredder separately Autoclave or microwaves separately temperature monitor attached outside of machine operating Fuel and electric – Toxic and dangerous wastes, – Medical pharmaceutical and hospitable liquids Wastes – Domestic garbage – Electric and electronic wastes – Industrial wastes – In General, all type of wastes and garbages 1) working now in new order for Nigeria though our company for Yd-300 x 2 units , this is a job in hand in our customer located in dubai 2) the customer also want also to buy a fuel bulk storage tank to be for 3 days continuous operation so we hope also you can manufacture it so please give me the best price for fuel bulk storage tank to be for 3 days continuous operation for YD-300 3) installation must be in the site in Nigeria by your company ,as i know your price rate which you sent to be before 4) what is the best price CIF Nigeria in lagos sea port as i have only price for cif dubai 5) 150 pcs Waste Containers (820 L) fully compatible with the incinerator and clinical waste container washing system. please send me the price and catalog for this item 6) also they need Automatic Clinical Waste Container Washing System complete in every respect and fully compatible with containers price and catalog 7) 2 units 1.5 tonne Fork Lift ( if you know good price and quality company in china) 8) 1 unit Clinical Waste Container Vehicles complete in every respect and fully compatible with containers. 9) Spare Parts For 2 Years Operation & Maintenance for YD-300 and for the above machines 10) all parts , pipe work electrical work and civil work for incinerator must be provided and material must be quoted The highest temperature that the filter bag can operate continuously is 260C. In order to add a bag house using our filter products, you would need to add a water cooling tower or other method to reduce the inlet temperature at the baghouse to less than 260C. If you cannot lower the temperature below 260C, then we cannot utilize our membrane filter bags.
Domestic Waste
Waste Type: Domestic Waste Average Emissions Rates: Not to exceed EU Standard Limits (Total dust “mg/m3”: 30; Sulphur Dioxide: 200;Nitrogen Dioxide: 400; Carbon Monoxide: 100) Minimum Burn Rate: 2,000 kg per day (up to 1,500-person camp); top loading Insulation: high-grade fireproof insulation backing. Loading/Ash removal: Manual loading and ash removal from side door or tray. External Finish: high-temperature coat Controls: Fully automatic control through PLC system for burn chamber temperature; burn and cool down cycles Operational Temperature: 850-133000 Burner/s: Fully automatic, high-efficiency burners with electronic ignition, flame recognition sensors with combustion control features; Burner Fuel: Diesel; Electrical supply: Single, 220-240V; or 3-phase, 380-415V,50-60Hz Complete kit with chimney, filters (if applicable) and 2 years spare parts. Manufacturer specification, photographs/catalogue and technical datasheet shall be provided
Double Combustion Chamber Incinerator
● Double Combustion Chamber All waste incinerator design with double combustion chamber. High Temperature, Smoke Treatment,No black smoke, Environmentally friendly. ● Containerized Mobile Incinerator The incinerator mounted in ISO Container before leave factory, free-installation, no incineration house build construction,movable by truck. ● Family Pet Dog&Cat Cremation Special design with movable platform, combustion chamber material and custom made for pets crematory business. ● Installation and Commissioning Clover’s engineers instal,train for most of the region and free-cost train in our factory.
supply and installation of an incinerato...
the supply and installation of an incinerator furnace with a capacity of 300 kg of animal carcasses in a normal working day 5:00 , with burner and all the necessary accessories for its proper functioning . This kiln incinerator must be stationary on a concrete foundation . It will also be provided : the supply and electrical connection between the incinerator furnace and the control cabinet the supply and installation of the fireplace, the supply and fitting of the burner, the supply and installation of all the refractory masonry, the heating tools ( shovels, picks, scrapers , etc. ….. ) . the fuel tank with a capacity of 3000 liters , the daily capacity of 300 liters tank the supply of 3300 liters of diesel , after testing, the connection between the main fuel tank , daily tank and furnace , training of operating and maintenance personnel , commissioning and comprehensive testing of all equipment , the supply water in the incinerator vessel by pipe diameter 26 /34.
Animal wastes incinerators
Version , the entire carcass of animals ( cattle , horses , Sheep, pigs , etc.) , as well as biologically hazardous waste Products in the fuel stove . ? Opening Doors – the closure and fixation automated system , Which are managed remotely by the operator . ? designed to work in long mode and fast Action ( Quick Start EP – i) Fully mobile – mounted on wheeled chassis Even during the operation . Incinerators must be provided As standard equipment a special truck air retention for at least 2 seconds at a temperature of less than 850C, the combustion In order to achieve the proper effect. must be a two-chamber incinerators, primary and secondary Fuel stoves The waste products to reduce the initial volume Possible to minimize (approximately 5% sterile ash Form). Incinerators should be provided in the fuel tank (diesel ) The minimum capacity of the animal carcass incinerator The destruction of 1000 kg / hour. Incinerator capacity is calculated 8MJ/kg- material and 60 % humidity. It must be possible to use the incinerator +40 C to – 15 0C Temperature and 5% – 95% – of moisture conditions. ? PLC controller and a built-in temperature panelita complete Automatic control, a control computer, which is stored Information on the variation of temperature with respect to time and Graphic images. must have fuel with automatic control and malfunction Detection system. ?the ability to pre- warm-up , body waste burning on and off Consistency is independent of the first and secondary chambers. ensuring the incinerator with electricity , it Must be installed on the generator. clean the incinerator should be simple tools , Without using any additional equipment Incinerator to burn 25 to 30 kg/hr of waste Double Chamber Low maintenance with diesel filled and no more than 15amp 220 C 250 V KW must be stated. Onboard or inbuilt fuel storage tank, no more than 12L of diesel/hr Simple start for less operator training skills System to accommodate low power and frequent supply problems
Animal wastes incinerators
Version , the entire carcass of animals ( cattle , horses , Sheep, pigs , etc.) , as well as biologically hazardous waste Products in the fuel stove . ? Opening Doors – the closure and fixation automated system , Which are managed remotely by the operator . ? designed to work in long mode and fast Action ( Quick Start EP – i) Fully mobile – mounted on wheeled chassis Even during the operation . Incinerators must be provided As standard equipment a special truck air retention for at least 2 seconds at a temperature of less than 850C, the combustion In order to achieve the proper effect. must be a two-chamber incinerators, primary and secondary Fuel stoves The waste products to reduce the initial volume Possible to minimize (approximately 5% sterile ash Form). Incinerators should be provided in the fuel tank (diesel ) The minimum capacity of the animal carcass incinerator The destruction of 1000 kg / hour. Incinerator capacity is calculated 8MJ/kg- material and 60 % humidity. It must be possible to use the incinerator +40 C to – 15 0C Temperature and 5% – 95% – of moisture conditions. ? PLC controller and a built-in temperature panelita complete Automatic control, a control computer, which is stored Information on the variation of temperature with respect to time and Graphic images. must have fuel with automatic control and malfunction Detection system. ?the ability to pre- warm-up , body waste burning on and off Consistency is independent of the first and secondary chambers. ensuring the incinerator with electricity , it Must be installed on the generator. clean the incinerator should be simple tools , Without using any additional equipment Incinerator to burn 25 to 30 kg/hr of waste Double Chamber Low maintenance with diesel filled and no more than 15amp 220 C 250 V KW must be stated. Onboard or inbuilt fuel storage tank, no more than 12L of diesel/hr Simple start for less operator training skills System to accommodate low power and frequent supply problems
Incinerators differ from the simpler met...
Incinerators differ from the simpler methods of open burning as the operator has a higher degree of control over the burning process. The resulting higher temperatures, longer holding times and greater turbulence lead to more complete combustion of the waste. Although a wider range of wastes can be destroyed using high temperature single or dual-chambered […]
ENVIRONMENTAL PROTECTION ACT
The following are excerpts from the Environmental Protection Act 1. “Contaminant” means any noise, heat, vibration or substance and includes such other substance as the Minister may prescribe that, where discharged into the environment, (a) endangers the health, safety or welfare of persons, (b) interferes or is likely to interfere with normal enjoyment of life […]
Environmental Guideline for the Burning ...
People living and working in Nunavut often have limited options available for cost effective and environmentally sound management of household and other solid waste. The widespread presence of permafrost, lack of adequate cover material and remote locations make open burning and incineration a common and widespread practice to reduce the volume of solid waste and […]
Waste Burning and Incineration Combustio...
The combustion, or burning, of solid waste proceeds through a series of stages. Water is first driven from the unburned waste by heat produced from material burning nearby or from an auxiliary burner. As the waste heats up, carbon and other substances are released and converted into burnable gases. This is referred to as gasification. […]









