Waste Incinerator|Medical Waste Incinerator|Pet Cremation|Tel: +86-25-8461 0201

Hospital Incinerators Refractory lined flanged chimney

All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rd 
schedule regulation (26, 47) pertaining classification, standards, criteria, and procedure for installing/operating incinerators as authored 
by the National Environmental Management and Coordination (waste management) regulation 2006, legal notice No. 121 of 29th September 2006
The capacity of the incinerator required should be to the specifications with a capacity to burn 100kgs/Hr
The incinerator shall be run on a 3-phase power supply (mains)
For the technical evaluation, not only the treatment plant but the entire system will be considered.  It will be the responsibility of the 
Bidder to supply a full system, including all eventually additionally necessary secondary systems and additional equipment.
The system offered shall be designed to operate normally under the conditions of the purchaser’s country. The conditions include Power 
Supply, Climate, Temperature, Humidity, etc.
Hospital Incinerators to Nema standards 

The following are the incinerator specifications :-
      Waste type:      Mixed type 0,1,2,3 & 4 hospital/clinical bio hazard waste
      Waste density:   125 to 350Kg/M³
      Waste CV:        4000 KCAL/Kg
      Moisture content:   10-25%
      Estimated ash residue: 5-10%
      Nominal capacity:   100Kg/hour batch load
      Secondary chamber:  2 second @ 1100ºC
The Incinerator must comprise of: –
      Manual Loading door (heavy duty steel door with appropriate refractory lining)
      Horizontal solid hearth, refractory lined primary combustion chamber 800mm diameter x 2100mm long
      Full sized bulk load/ash removal door
      1 off diesel-fired ignition burner – temperature controlled
      1 off combustion air supply fan and distribution system, automatic control
      High capacity secondary combustion chamber 2 second @ 1100ºC with
      1 off diesel-fired afterburner – temperature controlled
      Control Panel – automatic operation
      Temperature indication primary and secondary chambers 0-1200ºC. Both chambers must be insulated with refractory material (super 
duty 100mm thick firebrick with 25mm thick calcium silicate insulation)
      Refractory lined flanged chimney to a height of 10M and it must be 3m above the height of any existing roof adjacent to the 
incinerator

Recent Posts