Waste Incinerator|Medical Waste Incinerator|Pet Cremation|Tel: +86-25-8461 0201

Incinerator PDF Catalogue

Download latest Incinerator Catalogue

Learn more

Incinerator Products

Get Incinerator products Informaiton

Learn more

The Incinerator Features

What's the Features of our Incinerator?

Learn more

Incinerator Request

An Incinerator is to be supplied by the Contractor on a rental basis at a location established by the Company. The Contractor is to provide trained and competent personnel with initial ins [...]

Supply, Installation and Commissionin...

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication   For incineration, general and pathologicalCapacity    100 C 120 kg/h burn rateType T [...]

Supply of Inclinators for Interim Arr...

CMC Services for Inclinators for 3 years including all spares, consumables, Skilled Manpower, tools and tackles all complete. As per Scope attached as AnnexureDesign, Manufacture, Supply, delivery to sit [...]

Medical Incinerator Specification

Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upg [...]

a modern waste incinerator, designed ...

The incinerator should be a modern waste disposal unit, designed to burn medical waste in a clean and environmentally efficient manner. It should employ a temperature based logic control system&nbs [...]

Incinerator Spare part list

Spare part list – Ignition burner                          Item description                 &nb [...]

complete with electric ignition and f...

The waste will be reduced by 90~95% to leave 10 -5% ash   2.4 Quality/Environmental Standards   NEMA ACT (EMCA) 1999 BS3316   2.5 Operating Period   Anticipated daily operating period 8 hours   Maximum&n [...]

Incinerator to burn nearly 10ton(10,0...

Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant. Requirements: 1.Incinerator system complete with scrubber, pollution control system, water system, loading system, as [...]

HIGH TECH PYROLYTIC MEDICAL WEST INCI...

 HIGH TECH PYROLYTIC MEDICAL WEST INCINERATOR 1.Capacity of destruction in weight: 60Kg/h 2.It should be able to operate not less than 10 hours/day. 3.This incinerator must be able to destruct all  [...]

Incinerator Invitation for Bids (IFB)

Incinerator Invitation for Bids (IFB)  Name of Country:  Eritrea Name of Project:  Global Fund Grant No:  ERT-H-MOH Date: April 10, 2013  IFB Title: Procurement of Incinerator          &nbs [...]

Recent Posts