Waste Incinerator|Medical Waste Incinerator|Pet Cremation|Tel: +86-25-8461 0201

Posts in category epost

Top Loader incinerator for medical an...

Top Loader incinerator of general, medical and dry waste to comply with the requirements of the Air Quality Act, 2004 (Act No 39 of 2004)   1 Design standard Retort type, multiple 2 Description of chimney Top mounted, self supporting, unlined 3 Stack height from base At least 11 meter (depends [...]

Hospital Incinerators Refractory line...

All the incinerators to be supplied and installed must meet the Government of Kenya waste Management Regulation 2006 in particular 3rd schedule regulation (26, 47) pertaining classification, standards, c [...]

Incinerator Request

An Incinerator is to be supplied by the Contractor on a rental basis at a location established by the Company. The Contractor is to provide trained and competent personnel with initial ins [...]

Supply, Installation and Commissionin...

Supply, Installation and Commissioning of DIESEL FIRED INCINERATORSMedical Waste Incinerator, 100 to 120 Kg/hrApplication   For incineration, general and pathologicalCapacity    100 C 120 kg/h burn rateType T [...]

Supply of Inclinators for Interim Arr...

CMC Services for Inclinators for 3 years including all spares, consumables, Skilled Manpower, tools and tackles all complete. As per Scope attached as AnnexureDesign, Manufacture, Supply, delivery to sit [...]

Medical Incinerator Specification

Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upg [...]

a modern waste incinerator, designed ...

The incinerator should be a modern waste disposal unit, designed to burn medical waste in a clean and environmentally efficient manner. It should employ a temperature based logic control system&nbs [...]

Incinerator Spare part list

Spare part list – Ignition burner                          Item description                 &nb [...]

complete with electric ignition and f...

The waste will be reduced by 90~95% to leave 10 -5% ash   2.4 Quality/Environmental Standards   NEMA ACT (EMCA) 1999 BS3316   2.5 Operating Period   Anticipated daily operating period 8 hours   Maximum&n [...]

Incinerator to burn nearly 10ton(10,0...

Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant. Requirements: 1.Incinerator system complete with scrubber, pollution control system, water system, loading system, as [...]

Recent Posts