Supply of Inclinators for Interim Arr...

CMC Services for Inclinators for 3 years including all spares, consumables, Skilled Manpower, tools and tackles all complete. As per Scope attached as AnnexureDesign, Manufacture, Supply, delivery to sit [...]

Medical Incinerator Specification

Capacity Not less than 500Kg/hr.Operation 24hr-7days/week continuous operation.Combustion chamber 2 combustion chamber.Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upg [...]

a modern waste incinerator, designed ...

The incinerator should be a modern waste disposal unit, designed to burn medical waste in a clean and environmentally efficient manner. It should employ a temperature based logic control system&nbs [...]

Incinerator Spare part list

Spare part list – Ignition burner                          Item description                 &nb [...]

complete with electric ignition and f...

The waste will be reduced by 90~95% to leave 10 -5% ash   2.4 Quality/Environmental Standards   NEMA ACT (EMCA) 1999 BS3316   2.5 Operating Period   Anticipated daily operating period 8 hours   Maximum&n [...]

Incinerator to burn nearly 10ton(10,0...

Incinerator to burn nearly 10ton(10,000kg) of tobacco waste dust) from a tobacco processing plant. Requirements: 1.Incinerator system complete with scrubber, pollution control system, water system, loading system, as [...]

HIGH TECH PYROLYTIC MEDICAL WEST INCI...

 HIGH TECH PYROLYTIC MEDICAL WEST INCINERATOR 1.Capacity of destruction in weight: 60Kg/h 2.It should be able to operate not less than 10 hours/day. 3.This incinerator must be able to destruct all  [...]

Incinerator Invitation for Bids (IFB)

Incinerator Invitation for Bids (IFB)  Name of Country:  Eritrea Name of Project:  Global Fund Grant No:  ERT-H-MOH Date: April 10, 2013  IFB Title: Procurement of Incinerator          &nbs [...]

Design and Build approved gas cremati...

The Contractor shall provide a Cremation System package for  TWO (02) Cremators and system approved by related authority, which must fit into the allocated area as shown on the plan drawi [...]

islands incinerator

Application : four islands in Croatia Capacity/island : 4000 kg/day ; 25000 kg/day ; 31000 kg/day ; 48000 kg/day Burning temperature C over 12000C Two chambers C minimum Emissions C dioxin&nbs [...]